Completed successfully architectural design project for a pellets factory, Sofia

Completed successfully architectural design project for transformation of a building for warehouse and thermal power plant into a pellets factory in Obelya, Sofia. The project requires preparation of an architectural plan and all necessary for the purpose documents to change the purpose of the building into a new function area with the total extended built-up area of 1228,48 sq.m.

The project consists of a building on to levels, sub-terrain is not planned. The main production shop is with a light height of 7,20 m. In this zone it is also planned to have a rail track for a portal crane.

On the first level there are provided the entrances, the staircases for access to level 2, sanitary rooms, room for the main electric switch, boiler room and one office. The built-up area of the building is 1029,18 sq.m.
The second level has 199,30 sq.m area together with the stairs and has 5 offices, rest-room and kitchen with a sanitary unit.

Our company has completed and handed over the project documentation for the reconstruction of the production unit to the investor.